Call us today +44 (0)1254 915230

Airkix Manchester

We were contacted by Airkix back in 2007 in regard to a site they were building & opening at The Trafford Centre, next to Sno-Zone/Chill Factor. The site was due to open in 2009. We arranged for a Half-hourly meter and a MOP contract to cover the usage based on the existing site at Milton Keynes.

Late 2008, the local Energy Network wrote to Airkix suggesting that the existing network would need reinforcing to cope with Airkix and the planned construction in the area and that Airkix should contribute an apportioned amount of the £130,000.00 cost to upgrade the network.

We fought this on behalf of Airkix and eventually the cost was waived. The Airkix site opened on time and everything went smoothly.

How Can We Help?

Get in touch to find out how Black Cat energy can help your business.




Client Work

Airkix Manchester

Find out how Black Cat Energy helped Airkix, Manchester

Find out more
Our Services

Reduce your Energy Bills

Find out More

Energy management Surveys

Find out More

Black Cat Specialist Energy Broker

Find out More
Latest News

News Post 3

Read More

News Post 2

Read More

News Post

Read More